I was a Project Coordinator
in this constructional duty.

  I was a Project Coordinator
in this constructional duty.
  I was a Project Coordinator
in this constructional duty.

I was a Project Coordinator
in this constructional duty.

- Campus Sport Complex undress rooms constructive.
- Campus paint,limewash,
installment and completion works.
- Printing House Constructive.
- Atelier Constructive.
- Energy Transport Line.
- Campus Football Field grandstand constructive.
- Campus Athleticism Field
and areas completed.
- Campus Environmental Road sideline walls constructive.
- Club Muskebi Holiday Village Sport Center and grass field
arrangements completed.
- Mugla Ziraat of Banking
Transformer Center Constructional formation.
- Credit and Student Dormitory Foundation Mugla Milli Piyango
Student Dormitory Water tank
and Clor house constructive.
  I was a Project Coordinator
in this constructional duty.
  • Biochemistry Laboratouary •
Laboratouary complete destroyed,TSE ve ISO
standarts make over again.
Totaly 400 m2 .
  • Cafeteria Constructions •
4 Floors Building designed and prepared all key to deliver.

Totaly 1500 m2
• Cafeteria Constructions •
4 Floors waterside Residence
lower two floors to make into to transform cafeteria.

Tourism development and ecological protective managment.
- Fethiye Oludeniz Mayoralty
Belcekız district. Rain water
drainage area construction works.

  • Building a Property •
5 Floors Küçük Yalı Project.
  • Aora Computer System •
Office alteration works.
  • House alteration Project •
Ümraniye.

 
  - Back -